Custom Measurement Guide for Malaysia Projects

Use this checklist before ordering made-to-measure kitchen cabinets, wardrobes, doors or windows. A discussion sketch is not a production measurement.

How to prepare verified measurements

  1. Record room width, height and depth at more than one point.
  2. Mark doors, windows, columns, beams, skirting and floor-level changes.
  3. Locate electrical, plumbing, gas, ventilation and appliance connections.
  4. Photograph access routes, lift sizes, stairs and unloading space.
  5. Record the postcode, building rules and preferred delivery window.
  6. Ask the appointed Malaysia contractor or installer to check final dimensions, substrate, fixings and local approvals before written production approval.

What to send with the enquiry

Send the plan, photos, product list, quantity, material or finish direction, target date and any installation constraints. Keep the approved drawing and measurement record with the quotation.

MALAYSIA PROJECT NOTE

Malaysia Project Note

This page explains the information, verification and responsibility needed when the relevant Forge service is used for a project in Malaysia.

Confirm final decisions in approved drawings, written specifications, quotation terms and local professional advice.

Ask About a Malaysia Project